TAMALPAIS VALLEY, Marin County — October 31, 2026. Marin County has approved a project intended to improve flood protection for residences near Cardinal Road, Coyote Creek and the Shoreline Highway corridor. The upgrade addresses long-running leakage through and beneath an existing levee during high tides and storms.
What was approved?
The official environmental record says the Marin County Flood Control and Water Conservation District Board approved the project and its Final Initial Study/Mitigated Negative Declaration on April 7, 2026. A Notice of Determination was filed April 14.
What will be built?
The plan proposes approximately 1,100 feet of steel sheet-pile floodwall, extending three feet above the existing floodwall, plus storm-drain changes and a culvert replacement. The goal is to reduce seepage and support resilience against projected mid-century sea-level rise. The project does not mean every low-lying parcel in Tamalpais Valley will be protected against all storms.
Is construction complete?
No. Board approval and environmental findings are legal milestones, separate from an awarded construction contract and finished work. An earlier capital program projected a possible 2027 construction start, but that schedule should be verified against updated county public works notices.
Why the timing matters
Flooding can impede access to homes and businesses along the Richardson Bay shoreline. Residents should continue to follow active warnings, avoid crossing flooded roads and report emerging infrastructure failures to the responsible agency while waiting for long-term improvements.
Source: Marin County Cardinal Road Levee Upgrade Project environmental review and April 2026 determination.
Support Tamalpais Valley News
Choose how to support Tamalpais Valley News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Tamalpais Valley News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Tamalpais Valley News
- Tam Junction Study Puts Pedestrian Safety, Parking and Sea-Level Rise on County Agenda →
- Tam Valley Tree Removal Request for 11 Bay and Oak Trees Near Alta Way Remains Under Review →
- Deertrail Lane Home Addition and ADU Proposal in Tamalpais Valley Awaits Design Review →
- Tamalpais Valley's Shoreline Apartments Reach Construction Stage: 32 Affordable Homes Taking Shape →
СООБЩЕСТВО
Комментарии
Присоединяйтесь к обсуждению California58. Чтобы комментировать, необходимо войти в аккаунт.
Создайте бесплатный аккаунт California58 или войдите через доступную социальную сеть.